
3 Axle Cement Silo Semi Trailer with Weichai Engine and Compressor
Model: KYD-CS42
Complete cement silo trailer package with integrated Weichai engine compressor unit. Turnkey solution for cement transport and on-site storage applications.
Key Technical Specifications
52 Tons
3 Axles
KYD-CS42
ISO 9001 & CE
Commercial Information
Product Overview
The KYD-CS42 Cement Silo Semi Trailer combines transport functionality with temporary storage capability, ideal for remote construction sites and batch plant support.
Dual-Purpose Design: - Functions as transport tanker and temporary silo - On-site storage capacity: 42 cubic meters - Direct discharge to concrete batchers or pumps - Eliminates intermediate handling steps
Weichai Power Package: - Weichai WP6 series 6-cylinder diesel engine - 48 kW (64 HP) rated output at 1500 RPM - Electric start with 24V battery system - Fuel-efficient operation: 8 liters/hour average
Compressor Integration: - Direct-coupled Roots blower via flexible coupling - No belt maintenance required - Enclosed compressor house protects from weather - Sound attenuation for noise reduction
Site Storage Features: - Level indicator shows remaining inventory - Aeration pads prevent cement compaction during storage - Dust filter vents protect environment - Rain-proof manhole covers keep contents dry
Discharge Versatility: - Pump directly into mixer trucks - Feed concrete batching plants - Supply shotcrete and grouting operations - Fill stationary silos as needed
Mobility Advantages: - Road-legal design enables rapid site relocation - No foundation required - park and operate - Hydraulic landing gear for stable positioning - Quick setup in under 30 minutes
Perfect for infrastructure contractors, precast concrete yards, remote mining camps, and emergency cement supply operations.
Complete Technical Specifications
General Specifications
| Model | KYD-CS42 |
| Configuration | 3 Axle Cement Silo Trailer |
| Total Volume | 42 Cubic Meters |
| Storage Capacity | 55 Tons Cement |
| Working Pressure | 0.2 MPa |
| Application | Transport + Storage |
Power Unit
| Engine Brand | Weichai WP6 Series |
| Engine Type | 6-Cylinder Turbo Diesel |
| Rated Power | 48 kW / 64 HP |
| Speed | 1500 RPM Optimal |
| Starting System | 24V Electric Start |
| Fuel Consumption | 8 Liters/Hour Average |
Compressor Assembly
| Type | Roots Blower Direct-Coupled |
| Air Flow | 13 m³/min |
| Operating Pressure | 0.2 MPa Max |
| Enclosure | Weather-Proof Housing |
| Noise Level | < 82 dB at 7 Meters |
Storage Features
| Level Indicator | Mechanical Float Type |
| Aeration System | Bottom Canvas Pads |
| Dust Filter | Fabric Bag Type |
| Vent Capacity | 2000 m³/hour |
| Manhole Covers | Gasketed Weather-Sealed |
Discharge System
| Outlet Size | 125 mm Flanged |
| Discharge Rate | 1.5 Tons/Minute |
| Residue Rate | < 0.3% |
| Hose Included | 10 Meter x 125mm |
| Couplings | Quick-Release Camlock |
Stabilization
| Landing Gear | Hydraulic Dual-Speed |
| Outriggers | Manual Screw Type x4 |
| Level Indicators | Bubble Levels Mounted |
| Ground Clearance | 350 mm Transport |
Axle & Suspension
| Axle Brand | FUWA 13 Ton |
| Axle Count | 3 |
| Suspension | Leaf Spring 10/10/10 |
| Brakes | WABCO ABS Air Brakes |
| Tires | 12R22.5 All-Position |
Dimensions
| Length | 11,600 mm |
| Width | 2,500 mm |
| Height | 3,900 mm |
| Tare Weight | 7,500 kg |
| Gross Weight | 62,500 kg |
Electrical System
| Battery | 24V 180Ah x2 |
| Alternator | 28V 55A |
| Lighting | LED Marker Lights |
| Control Panel | Engine Instruments + Gauges |
Key Features & Advantages
Transport + Storage Dual Function
Eliminates need for separate silo at temporary job sites
Weichai WP6 Diesel Engine
Reliable 6-cylinder power with direct-coupled compressor drive
Direct-Coupled Compressor
No belts to maintain, efficient power transmission
55 Ton Storage Capacity
Provides 3-5 days cement supply for typical concrete operations
Rapid Site Deployment
Set up and begin discharging in under 30 minutes
Applications & Use Cases
Remote Construction Sites
Bridge, tunnel, and dam projects without permanent silo infrastructure
Concrete Batch Plant Support
Supplemental storage during peak demand periods
Mining Camp Infrastructure
On-site cement supply for underground support works
Emergency Response
Rapid deployment for disaster reconstruction efforts
Frequently Asked Questions (FAQ)
Q1How long can cement be stored?
Properly sealed, cement remains usable for 2-4 weeks. Recommend rotation for best quality.
Q2Can I leave this on-site long-term?
Yes, but periodic engine runs and system checks are recommended.
Q3What maintenance is required?
Standard diesel engine maintenance plus compressor oil changes per schedule.
Q4Is winter operation possible?
Yes, the enclosed compressor house protects from cold. Engine block heater optional.
Ready to Discuss Your Requirements?
Contact our sales team today for customized solutions, competitive pricing, and fast delivery. We respond to all inquiries within 24 hours.